Character proportions
Confirm front, side and back silhouettes and lock the expression, clothing and accessory details that must remain.
YILIUBA PLUSH TOYS东莞毛绒玩具生产工厂PLUSH SAMPLING GUIDE
A design file does not become a production-ready plush toy in one step. It normally moves through project review, structure breakdown, materials and process confirmation, pattern and sample making, and revision approval.

DIRECT ANSWER
For a project with complete information and standard construction, a first sample typically takes about seven days. Timing starts when artwork, dimensions, material direction and key process requirements are clear and the project is ready for sampling. Complex construction, special fabrics or multiple revisions require separate assessment.
HOW IT WORKS
Confirming dimensions, materials, construction and use early helps control revisions and later production risk.
Confirm product type, target size, estimated quantity, destination market, packaging and target delivery date.
Translate the artwork into proportions, panels, fabrics, filling, embroidery, accessories and an assembly plan that can be repeated in production.
Evaluate fabrics, filling, embroidery, printing and accessories against appearance, hand feel, use, budget and market requirements.
Develop patterns and embroidery files, then cut, sew, fill, shape and assemble the first physical sample.
Record revisions to proportions, expression, colour, hand feel, clothing and accessories before the approved sample moves toward production.
FROM ARTWORK TO CONSTRUCTION
A good prototype should match the design intent while keeping proportions, hand feel and assembly consistent in repeat production.
Confirm front, side and back silhouettes and lock the expression, clothing and accessory details that must remain.
Match fabrics, filling and trims to size, use, target price and destination market.
Assess embroidery, printing, panels, three-dimensional parts and small accessories for durability and repeatability.
Consider sewing paths, tolerances, shaping and inspection requirements during sampling to reduce bulk variation.
FAQ
These are general project references. Final materials, cost, MOQ and timing depend on the specific brief.
Yes. We can begin with an initial review, then normally need side and back views, dimensions, colours and key construction details to improve sample accuracy.
For a project with confirmed information and standard construction, the first sample typically takes about seven days. Complex structures, special fabrics or multiple revisions require separate assessment.
Size, fabric, embroidery area, accessories, packaging, order quantity and inspection requirements all affect cost.
An NDA can be discussed before development to protect artwork, character information, samples and project communications. The customer should have the necessary rights or authorization for submitted materials.
START A PROJECT
Send your artwork, target size, estimated quantity, destination market and target delivery date. We will review structure, materials, process, MOQ and next steps.